Fees for new construction and additions are based upon the value of the construction performed or the minimum valuations as determined by the attached Minimum Valuation Table whichever is greater.

 

Fees applied for base construction do not cover HVAC, Plumbing, Electric, and specialized systems listed under the attached schedule titled, Permit fees for specialized system reviews.

 

Fee Determination

Example:

Type of Construction: IIB              Use Group: A-2

Square Footage: 10,000               Actual cost of construction: $999,000

 

Step 1:   Given the type of construction and use group a minimum square foot valuation of $86.00 a square foot is derived from the Minimum Valuation Chart.

 

Step 2:  The minimum valuation of the project is determined by multiplying the square footage of the structure by the cost factor found in step one.  10,000 Sq. Ft. X $86.00= $860,000

 

Step 3:  The minimum valuation found in Step 2 is now compared to the actual cost of construction to determine which is greater.

Actual cost of Construction $999,000>$860,000 Calculated Minimum Valuation

 

Step 4:  Use the determined greater valuation in this case the actual cost of construction to determine the permit fee per the Commercial Building Permit Fee Schedule.  The fee is determined to be $1,500.

 

 

(Rev. Sept. 2015)

 

Minimum Valuation Table

 

                                                             TYPE OF CONSTRUCTION

USE GROUPS

IA

IB

IIA

IIB

IIIA

IIIB

IV

VA

VB

A-1

118.00

116.00

112.00

110.00

98.00

97.00

100.00

91.00

88.00

A-2

92.00

90.00

88.00

86.00

76.00

75.00

82.00

66.00

64.00

A-3/A-4

91.00

90.00

87.00

85.00

75.00

75.00

81.00

65.00

63.00

B

92.00

90.00

87.00

84.00

73.00

72.00

76.00

63.00

60.00

E

90.00

88.00

85.00

82.00

71.00

70.00

74.00

63.00

62.00

F-1/F-2

53.00

51.00

51.00

46.00

38.00

38.00

39.00

31.00

29.00

H

49.00

47.00

45.00

42.00

35.00

35.00

35.00

28.00

N.P.

I-1

78.00

76.00

73.00

71.00

62.00

62.00

63.00

56.00

55.00

I-2

123.00

121.00

117.00

115.00

103.00

102.00

106.00

92.00

N.P.

I-3

100.00

98.00

95.00

92.00

81.00

80.00

84.00

73.00

N.P.

M

72.00

71.00

68.00

66.00

56.00

56.00

63.00

47.00

44.00

R-1

81.00

80.00

77.00

75.00

65.00

65.00

68.00

57.00

55.00

R-2

75.00

72.00

69.00

67.00

58.00

58.00

59.00

49.00

48.00

R-3/R-4

65.00

73.00

61.00

59.00

55.00

55.00

56.00

50.00

48.00

S-1/S-2

49.00

47.00

45.00

42.00

35.00

35.00

35.00

28.00

26.00

 

Values = Minimum valuation per square foot.

 

 

(Rev. Sept. 2015)

 

COMMERCIAL BUILDING  PERMIT FEE SCHEDULE

Effective April 1, 2004

 

ESTIMATED CONSTRUCTION COST                              PERMIT FEE

 

$                          0         -            49,999.99..................................... 150.

             50,000.00         -            74,999.99..................................... 200.

             75,000.00         -            99,999.99..................................... 250.

           100,000.00         -          149,999.99..................................... 300.

           150,000.00         -          199,999.99..................................... 400.

           200,000.00         -          249,999.99..................................... 500.

           250,000.00         -          349,999.99..................................... 600.

           350,000.00         -          499,999.99..................................... 800.

           500,000.00         -          749,999.99.................................. 1,000.

           750,000.00         -          999,999.99.................................. 1,500.

        1,000,000.00         -       1,999,999.99.................................. 2,500.

        2,000,000.00         -       2,999,999.99.................................. 3,500.

        3,000,000.00         -       3,999,999.99.................................. 4,500.

        4,000,000.00         -       4,999,999.99.................................. 5,500.

        5,000,000.00         -       5,999,999.99.................................. 6,500.

                                                                                                      PLUS

 $1,000.00 FOR EACH ADDITIONAL MILLION DOLLARS OF CONSTRUCTION

 All fees must be paid in full at the time of submittal

 

Note: This fee covers plan review and inspection services

 

Permit fees for specialized system reviews

AUTOMATIC SPRINKLER REVIEW FEES

 

            Sprinkler Heads                                                          Plan Review Fee

                        1-200                                                                           150.00

                        201-300                                                                       175.00

                        301-400                                                                       210.00

                        401-750                                                                       250.00

                        Over 750                                                                     250.00 plus

                                                                                                            20 cents per head over 750

Limited Area Sprinkler Systems                                                          150.00

(Rev. Sept. 2015)

 

FIRE DETECTION SYSTEM REVIEW FEE

0 to 20,000 square feet shall be $150; over 20,000 square feet shall be $150 plus $25 for each additional 10,000 square feet in excess of 20,000 square feet.

 

HVAC PLAN REVIEW

All HVAC plans shall be submitted separately to this Department and must be submitted by the Kentucky Master HVAC Contractor per KRS.  HVAC fees are shown on the HVAC application form.

 

STANDPIPE PLAN REVIEW FEE

$150 (combination standpipe and riser plans will be reviewed under automatic sprinkler review fee schedule).

 

CARBON DIOXIDE SUPPRESSION SYSTEM REVIEW FEE

1 to 200 pounds of agent shall be $150; over 200 pounds of agent shall be $150 plus 10 cents per pound in excess of 200 pounds.

 

CLEAN AGENT SUPPRESSION SYSTEM REVIEW FEE

Up to 35 pounds of agent shall be $150; over 35 pounds shall be $150 plus 20 cents per pound over 35 pounds.

 

FOAM SUPPRESSION SYSTEM REVIEW FEE

$1.00 per gallon of foam concentrate.  The fee for review of plans shall not be less than $150 nor more than $1,500.

 

COMMERCIAL RANGE HOOD REVIEW FEE

$150 per hood.

 

DRY CHEMICAL SYSTEMS REVIEW FEE (EXCEPT RANGE HOODS)

1 to 30 pounds of agent shall be $150;  over 30 pounds of agent shall be $150 plus 35 cents per pound in excess of 30 pounds.

 

Signage

Signage over 32 square feet, $150.00 per sign

Signage under 32 square feet $30.00

 

Temporary Structures

Installation of temporary structures $150.00 per structure

 

Warehouse Racking

Fee based upon the Commercial Building Permit Fee Schedule.

Minimum $150.00 fee

 

 

 