MINIMUM COMMERCIAL VALUATION SCHEDULE
Effective April 1, 2004
NEW CONSTRUCTION, ALTERATIONS AND REPAIRS
Plan review fees for new construction, alterations and repairs are payable at time of application.
TYPE OF CONSTRUCTION
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
USE GROUPS |
IA |
IB |
IIA |
IIB |
IIIA |
IIIB |
IV |
VA |
VB |
A-1 |
118.00 |
116.00 |
112.00 |
110.00 |
98.00 |
97.00 |
100.00 |
91.00 |
88.00 |
A-2 |
92.00 |
90.00 |
88.00 |
86.00 |
76.00 |
75.00 |
82.00 |
66.00 |
64.00 |
A-3/A-4 |
91.00 |
90.00 |
87.00 |
85.00 |
75.00 |
75.00 |
81.00 |
65.00 |
63.00 |
B |
92.00 |
90.00 |
87.00 |
84.00 |
73.00 |
72.00 |
76.00 |
63.00 |
60.00 |
E |
90.00 |
88.00 |
85.00 |
82.00 |
71.00 |
70.00 |
74.00 |
63.00 |
62.00 |
F-1/F-2 |
53.00 |
51.00 |
51.00 |
46.00 |
38.00 |
38.00 |
39.00 |
31.00 |
29.00 |
H |
49.00 |
47.00 |
45.00 |
42.00 |
35.00 |
35.00 |
35.00 |
28.00 |
N.P. |
I-1 |
78.00 |
76.00 |
73.00 |
71.00 |
62.00 |
62.00 |
63.00 |
56.00 |
55.00 |
I-2 |
123.00 |
121.00 |
117.00 |
115.00 |
103.00 |
102.00 |
106.00 |
92.00 |
N.P. |
I-3 |
100.00 |
98.00 |
95.00 |
92.00 |
81.00 |
80.00 |
84.00 |
73.00 |
N.P. |
M |
72.00 |
71.00 |
68.00 |
66.00 |
56.00 |
56.00 |
63.00 |
47.00 |
44.00 |
R-1 |
81.00 |
80.00 |
77.00 |
75.00 |
65.00 |
65.00 |
68.00 |
57.00 |
55.00 |
R-2 |
75.00 |
72.00 |
69.00 |
67.00 |
58.00 |
58.00 |
59.00 |
49.00 |
48.00 |
R-3/R-4 |
65.00 |
73.00 |
61.00 |
59.00 |
55.00 |
55.00 |
56.00 |
50.00 |
48.00 |
S-1/S-2 |
49.00 |
47.00 |
45.00 |
42.00 |
35.00 |
35.00 |
35.00 |
28.00 |
26.00 |
Values = Minimum valuation per square foot.
CHANGE IN USE
Plan review fees for existing buildings in which the use group or occupancy type is changed shall be calculated by using the total square footage of the entire building or structure under the new occupancy type as determined by the outside dimensions.
MECHANICAL PLAN REVIEW
If mechanical plans or drawings are not included in the permit for the base building, mechanical permit fees will be calculated at ten percent (10%) of the construction cost for the base building
AUTOMATIC SPRINKLER REVIEW FEES |
|
|---|---|
| Sprinkler Heads | Plan Review Fee |
| 1 - 10 | Determined in Plan Review |
| 11-200 | 150.00 |
| 201-300 | 175.00 |
| 301-400 | 210.00 |
| 401-750 | 250.00 |
| 401-750 | 250.00 |
| Over 750 | 250.00 plus |
| Limited Area Sprinkler Systems | |
| 1 head | Determined in Plan Review |
| Over 1 head | 150.00 |
FIRE DETECTION SYSTEM REVIEW FEE
0 to 20,000 square feet shall be $150; over 20,000 square feet shall be $150 plus $25 for each additional 10,000 square feet in excess of 20,000 square feet.
STANDPIPE PLAN REVIEW FEE
$150 (combination standpipe and riser plans will be reviewed under automatic sprinkler review fee schedule).
CARBON DIOXIDE SUPPRESSION SYSTEM REVIEW FEE
1 to 200 pounds of agent shall be $150; over 200 pounds of agent shall be $150 plus 10 cents per pound in excess of 200 pounds.
CLEAN AGENT SUPPRESSION SYSTEM REVIEW FEE
Up to 35 pounds of agent shall be $150; over 35 pounds shall be $150 plus 20 cents per pound over 35 pounds.
FOAM SUPPRESSION SYSTEM REVIEW FEE
$1.00 per gallon of foam concentrate. The fee for review of plans shall not be less than $150 nor more than $1,500.
COMMERCIAL RANGE HOOD REVIEW FEE
$150 per hood.
DRY CHEMICAL SYSTEMS REVIEW FEE (EXCEPT RANGE HOODS
1 to 30 pounds of agent shall be $150; over 30 pounds of agent shall be $150 plus 35 cents per pound in excess of 30 pounds.
FLAMMABLE, COMBUSTIBLE LIQUIDS OR GASES AND HAZARDOUS MATERIALS
PLAN REVIEW FEE
Refer to State Fire Marshal.
COMMERCIAL BUILDING PERMIT FEE SCHEDULE
Effective April 1, 2004
Estimated Construction Cost (Dollars) |
Permit Fee
|
||
30,000.00 |
- |
49,999.99 |
150. |
50,000.00 |
- |
74,999.99 |
200. |
75,000.00 |
- |
99,999.99 |
250. |
100,000.00 |
- |
149,999.99 |
300. |
150,000.00 |
- |
199,999.99 |
400. |
200,000.00 |
- |
249,999.99 |
500. |
250,000.00 |
- |
349,999.99 |
600. |
350,000.00 |
- |
499,999.99 |
800. |
500,000.00 |
- |
749,999.99 |
1,000. |
750,000.00 |
- |
999,999.99 |
1,500. |
1,000,000.00 |
- |
1,999,999.99 |
2,500. |
2,000,000.00 |
- |
2,999,999.99 |
3,500. |
3,000,000.00 |
- |
3,999,999.99 |
4,500. |
4,000,000.00 |
- |
4,999,999.99 |
5,500. |
5,000,000.00 |
- |
5,999,999.99 |
6,500. |
$1,000.00 for each additional million dollars of construction |
|||

