RESIDENTIAL FEE STRUCTURE
Effective April 1, 2004 |
| |
| MINIMUM VALUATION FACTORS FOR DETERMINING COST OF CONSTRUCTION |
| |
|
|
|
| Living Space (Outside dimensions) |
$45 per sq. ft. |
|
| |
|
|
|
| Basements (Unfinished) |
$12 per sq. ft. |
|
| |
|
|
|
| Garages (attached) |
$10 per sq. ft. |
|
| |
|
|
|
| Garages (Detached) |
$15 per sq. ft. |
|
| |
|
|
|
| Finished Basement |
$22 sq. ft. |
|
| |
|
|
|
| FLAT FEES AND MISCELLANEOUS |
| Sidewalk-Apron Inspection Fee |
$30 |
|
| |
|
|
|
| Decks & Storage Sheds |
$30 |
up to 200 sq. ft. $5 for each additional 100 sq. ft. or fraction thereof |
| |
|
|
|
| |
|
|
|
| In ground Pools |
$100 |
|
| |
|
|
|
| Pole Barns |
$40 |
up to 1,000 sq. ft. $5 for each additional 500 sq. ft. or fraction thereof |
| |
|
|
|
| Residential Demolition |
$75 |
|
| (Commercial Demos – see commercial schedule-based on cost of construction) |
| |
|
|
|
| Plan Revision Fee |
$50 |
|
| |
|
|
|
| Re inspection Fee |
$50 |
paid prior to the re-inspection |
| Re-inspection fees will be charged as required by the Chief Building Official. |
| |
|
|
|
| Alteration and Repair Fee |
$20 |
per sq. ft. (minimum $50 fee) |
| |
|
|
|
| Residential Replacement HVAC Permit |
$50 |
|
| |
|
|
|
PERMIT FEE ENHANCEMENT
Permit fees shall double for any person, business or corporation who begins construction without first having obtained the required permit per Boone County Ordinance 930.9.
NOTE: If the cost of construction submitted by the builder on the permit application is greater than this fee schedule, fees will be based on the construction cost noted on the application.
| |
ESTIMATED CONSTRUCTION COST |
PERMIT FEE |
| $ |
0 |
- |
999.99 |
20. |
| |
1,000.00 |
- |
4,999.99 |
30. |
| |
5,000.00 |
- |
9,999.99 |
40. |
| |
10,000.00 |
- |
14,999.99 |
60. |
| |
15,000.00 |
- |
29,999.99 |
85. |
| |
30,000.00 |
- |
49,999.99 |
150. |
| |
50,000.00 |
- |
74,999.99 |
200. |
| |
75,000.00 |
- |
99,999.99 |
250. |
| |
100,000.00 |
- |
149,999.99 |
300. |
| |
150,000.00 |
- |
199,999.99 |
400. |
| |
200,000.00 |
- |
249,999.99 |
500. |
| |
250,000.00 |
- |
349,999.99 |
600. |
| |
350,000.00 |
- |
499,999.99 |
800. |
| |
500,000.00 |
- |
749,999.99 |
1,000. |
| |
750,000.00 |
- |
999,999.99 |
1,500. |
| |
1,000,000.00 |
- |
1,999,999.99 |
2,500. |
| |
2,000,000.00 |
- |
2,999,999.99 |
3,500. |
| |
3,000,000.00 |
- |
3,999,999.99 |
4,500. |
| |
4,000,000.00 |
- |
4,999,999.99 |
5,500. |
| |
5,000,000.00 |
- |
5,999,999.99 |
6,500. |
PLUS
$1,000.00 FOR EACH ADDITIONAL MILLION DOLLARS OF CONSTRUCTION